Skip to content
EPCMap

How energy efficient are homes in WR3 (Worcester)?

Summary

Average rating

D65

Worcester average: D 67

Homes in WR3 have an average EPC rating of D (65), a little below the Worcester average of D (67). 34% of homes here have solid walls with no insulation.

Rated D or worse
58%
Worcester: 50%
Typical yearly energy cost
£1,046
EPCs since 2021, at prices then
Built before 1930
26%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Worcester average.

  • Band A, score 92 to 100: <1% of homes; Worcester <1%.
  • Band B, score 81 to 91: 14% of homes; Worcester 11%.
  • Band C, score 69 to 80: 28% of homes; Worcester 38%.
  • Band D, score 55 to 68: 40% of homes; Worcester 37%.
  • Band E, score 39 to 54: 15% of homes; Worcester 11%.
  • Band F, score 21 to 38: 3% of homes; Worcester 2%.
  • Band G, score 1 to 20: <1% of homes; Worcester <1%.

Based on the latest energy performance certificate (EPC) for each of 6,784 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in WR3.

Main heating

Gas boiler87%
Electric storage heaters5%
Other electric heating3%
Communal or district heating3%
Oil boiler2%

Type of home

House74%
Flat16%
Bungalow9%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated34%
Cavity walls, not insulated11%
Cavity walls, insulated38%
Solid walls, insulated4%
Other walls (timber, system-built or modern)13%
Loft insulation under 100 mm (homes with a loft)24%
Double or triple glazing throughout89%
Solar panels1%

Upgrades recommended for homes in WR3

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 79% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 66% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 57% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 35% of EPCs here (England and Wales: 24%). 34% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 24% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 17% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 93% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £189 a year, at the prices used when each EPC was issued.

Map of WR3 and nearby areas

How WR3 compares with the postcode districts around it.

B60, Bromsgrove: D 67DY13, Stourport-On-Severn: D 66B96, Redditch: D 63WR9, Droitwich: D 67WR4, Worcester: D 68WR99: not enough EPCs to showWR1, Worcester: D 67WR7, Worcester: D 59WR2, Worcester: C 69WR6, Worcester: D 56WR5, Worcester: C 69WR10, Pershore: D 68WR13, Malvern: D 62WR9WR4WR1WR7WR2WR3WR9WR4WR1WR7WR2WR5WR3
Colour shows each district's average rating. Tap a district to open it. WR3 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in WR3?

About 34% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.