Skip to content
EPCMap

How energy efficient are homes in WF1 (Wakefield)?

Summary

Average rating

C69

Wakefield average: D 68

Homes in WF1 have an average EPC rating of C (69), about the same as the Wakefield average of D (68).

Rated D or worse
44%
Wakefield: 50%
Typical yearly energy cost
£858
EPCs since 2021, at prices then
Built before 1930
20%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Wakefield average.

  • Band A, score 92 to 100: 1% of homes; Wakefield 1%.
  • Band B, score 81 to 91: 19% of homes; Wakefield 14%.
  • Band C, score 69 to 80: 35% of homes; Wakefield 35%.
  • Band D, score 55 to 68: 33% of homes; Wakefield 40%.
  • Band E, score 39 to 54: 10% of homes; Wakefield 9%.
  • Band F, score 21 to 38: 1% of homes; Wakefield 1%.
  • Band G, score 1 to 20: <1% of homes; Wakefield <1%.

Based on the latest energy performance certificate (EPC) for each of 16,054 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in WF1.

Main heating

Gas boiler79%
Other electric heating9%
Electric storage heaters8%
Communal or district heating2%
Heat pump1%

Type of home

House62%
Flat32%
Bungalow4%

Walls, roof and windows

Solid walls, not insulated17%
Cavity walls, not insulated10%
Cavity walls, insulated44%
Solid walls, insulated3%
Other walls (timber, system-built or modern)26%
Loft insulation under 100 mm (homes with a loft)24%
Double or triple glazing throughout95%

Upgrades recommended for homes in WF1

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Modern storage heaters More common here

    On 11% of EPCs here (England and Wales: 6%). 17% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Solar panels (PV)

    On 63% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 54% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 44% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 20% of EPCs here (England and Wales: 24%). 17% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 13% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 95% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £91 a year, at the prices used when each EPC was issued.

Map of WF1 and nearby areas

How WF1 compares with the postcode districts around it.

LS26, Leeds: D 67LS10, Leeds: C 70LS25, Leeds: C 69LS27, Leeds: D 67WF10, Castleford: C 69WF17, Batley: D 66WF3, Wakefield: C 69WF13, Dewsbury: D 64WF6, Normanton: D 67WF11, Knottingley: C 69WF5, Ossett: D 66WF2, Wakefield: D 67WF12, Dewsbury: D 66HD8, Huddersfield: D 66WF7, Pontefract: D 68WF8, Pontefract: C 69WF4, Wakefield: D 66WF9, Pontefract: D 68S71, Barnsley: D 68S72, Barnsley: D 67LS27WF3WF6WF5WF2WF7WF4WF1LS27WF3WF6WF5WF2WF7WF4WF1
Colour shows each district's average rating. Tap a district to open it. WF1 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in WF1?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.