Skip to content
EPCMap

How energy efficient are homes in WS6 (Walsall, South Staffordshire)?

Summary

Average rating

D66

South Staffordshire average: D 66

Homes in WS6 have an average EPC rating of D (66), about the same as the South Staffordshire average of D (66).

Rated D or worse
57%
South Staffordshire: 54%
Typical yearly energy cost
£1,073
EPCs since 2021, at prices then
Built before 1930
10%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the South Staffordshire average.

  • Band A, score 92 to 100: 1% of homes; South Staffordshire <1%.
  • Band B, score 81 to 91: 7% of homes; South Staffordshire 13%.
  • Band C, score 69 to 80: 35% of homes; South Staffordshire 33%.
  • Band D, score 55 to 68: 44% of homes; South Staffordshire 38%.
  • Band E, score 39 to 54: 11% of homes; South Staffordshire 12%.
  • Band F, score 21 to 38: 2% of homes; South Staffordshire 3%.
  • Band G, score 1 to 20: <1% of homes; South Staffordshire <1%.

Based on the latest energy performance certificate (EPC) for each of 4,735 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in WS6.

Main heating

Gas boiler93%
Electric storage heaters2%
Other electric heating2%
Communal or district heating2%
Heat pump1%

Type of home

House71%
Bungalow19%
Flat10%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated14%
Cavity walls, not insulated19%
Cavity walls, insulated57%
Solid walls, insulated1%
Other walls (timber, system-built or modern)9%
Loft insulation under 100 mm (homes with a loft)21%
Double or triple glazing throughout94%
Solar panels1%

Upgrades recommended for homes in WS6

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Loft insulation top-up More common here

    On 19% of EPCs here (England and Wales: 12%). 21% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350
  • Solar panels (PV)

    On 84% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 71% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 70% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 25% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 21% of EPCs here (England and Wales: 16%). 19% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £138 a year, at the prices used when each EPC was issued.

Map of WS6 and nearby areas

How WS6 compares with the postcode districts around it.

WS15, Rugeley: D 66WS12, Cannock: D 68WS7, Burntwood: D 66ST19, Stafford: D 67WS11, Cannock: D 68WS8, Walsall: D 67WV11, Wolverhampton: D 67WS3, Walsall: D 67WV12, Willenhall: D 66WV10, Wolverhampton: D 67WS4, Walsall: D 65WS2, Walsall: D 68WS9, Walsall: D 66WS11WV11WS3WS6WS11WV11WS3WS6
Colour shows each district's average rating. Tap a district to open it. WS6 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in WS6?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.