Skip to content
EPCMap

How energy efficient are homes in OX11 (Didcot, South Oxfordshire)?

Summary

Average rating

C73

South Oxfordshire average: D 68

Homes in OX11 have an average EPC rating of C (73), well above the South Oxfordshire average of D (68).

Rated D or worse
33%
South Oxfordshire: 47%
Typical yearly energy cost
£800
EPCs since 2021, at prices then
Built before 1930
5%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the South Oxfordshire average.

  • Band A, score 92 to 100: 2% of homes; South Oxfordshire 1%.
  • Band B, score 81 to 91: 37% of homes; South Oxfordshire 23%.
  • Band C, score 69 to 80: 28% of homes; South Oxfordshire 29%.
  • Band D, score 55 to 68: 25% of homes; South Oxfordshire 32%.
  • Band E, score 39 to 54: 7% of homes; South Oxfordshire 12%.
  • Band F, score 21 to 38: 1% of homes; South Oxfordshire 3%.
  • Band G, score 1 to 20: <1% of homes; South Oxfordshire <1%.

Based on the latest energy performance certificate (EPC) for each of 16,602 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in OX11.

Main heating

Gas boiler81%
Electric storage heaters7%
Heat pump5%
Other electric heating3%
Oil boiler3%

Type of home

House76%
Flat15%
Bungalow7%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated4%
Cavity walls, not insulated10%
Cavity walls, insulated43%
Other walls (timber, system-built or modern)43%
Loft insulation under 100 mm (homes with a loft)16%
Double or triple glazing throughout96%

Upgrades recommended for homes in OX11

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 74% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 69% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 37% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 18% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 11% of EPCs here (England and Wales: 16%). 10% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Loft insulation top-up

    On 11% of EPCs here (England and Wales: 12%). 16% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £74 a year, at the prices used when each EPC was issued.

Map of OX11 and nearby areas

How OX11 compares with the postcode districts around it.

OX18, Carterton: C 70OX9, Thame: C 69OX44, Oxford: D 65OX14, Abingdon: C 70OX49, Watlington: D 63OX13, Abingdon: C 70SN7, Faringdon: C 70RG4, Reading: D 66OX10, Wallingford: C 69OX12, Wantage: C 72RG9, Henley-On-Thames: D 63RG8, Reading: D 64RG31, Reading: D 66RG20, Newbury: D 59RG30, Reading: D 67RG18, Thatcham: D 65RG17, Hungerford: D 62SN8, Marlborough: D 61OX14OX13OX10OX12RG8OX11OX14OX13OX10OX12RG8OX11
Colour shows each district's average rating. Tap a district to open it. OX11 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in OX11?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.