Skip to content
EPCMap

How energy efficient are homes in OL15 (Littleborough, Rochdale)?

Summary

Average rating

D66

Rochdale average: D 68

Homes in OL15 have an average EPC rating of D (66), a little below the Rochdale average of D (68).

Rated D or worse
56%
Rochdale: 46%
Typical yearly energy cost
£1,154
EPCs since 2021, at prices then
Built before 1930
34%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Rochdale average.

  • Band A, score 92 to 100: <1% of homes; Rochdale <1%.
  • Band B, score 81 to 91: 10% of homes; Rochdale 11%.
  • Band C, score 69 to 80: 35% of homes; Rochdale 43%.
  • Band D, score 55 to 68: 42% of homes; Rochdale 36%.
  • Band E, score 39 to 54: 11% of homes; Rochdale 9%.
  • Band F, score 21 to 38: 2% of homes; Rochdale 1%.
  • Band G, score 1 to 20: <1% of homes; Rochdale <1%.

Based on the latest energy performance certificate (EPC) for each of 4,657 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in OL15.

Main heating

Gas boiler88%
Communal or district heating3%
Other electric heating2%
Electric storage heaters2%
Heat pump2%
Oil boiler1%

Type of home

House81%
Flat11%
Bungalow7%

Walls, roof and windows

Solid walls, not insulated23%
Cavity walls, not insulated21%
Cavity walls, insulated44%
Solid walls, insulated3%
Other walls (timber, system-built or modern)9%
Loft insulation under 100 mm (homes with a loft)24%
Double or triple glazing throughout94%
Solar panels1%

Upgrades recommended for homes in OL15

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 86% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 70% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 54% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 24% of EPCs here (England and Wales: 24%). 23% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 24% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 23% of EPCs here (England and Wales: 16%). 21% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 94% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £165 a year, at the prices used when each EPC was issued.

Map of OL15 and nearby areas

How OL15 compares with the postcode districts around it.

HX6, Sowerby Bridge: D 64HX2, Halifax: D 65HX7, Hebden Bridge: D 61OL14, Todmorden: D 61OL13, Bacup: D 65BB4, Rossendale: D 64HX4, Halifax: D 63OL12, Rochdale: D 67HD3, Huddersfield: D 66OL16, Rochdale: D 67OL11, Rochdale: D 67OL1, Oldham: C 69OL10, Heywood: D 68OL2, Oldham: D 66HD7, Huddersfield: D 64M24, Manchester: C 69OL3, Oldham: D 65HX6OL13OL12OL16OL11HD7OL15HX6OL13OL12OL16OL11HD7OL15
Colour shows each district's average rating. Tap a district to open it. OL15 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in OL15?

34% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.