Skip to content
EPCMap

How energy efficient are homes in PL2 (Plymouth)?

Summary

Average rating

D67

Plymouth average: D 68

Homes in PL2 have an average EPC rating of D (67), about the same as the Plymouth average of D (68). 36% of homes here have solid walls with no insulation.

Rated D or worse
52%
Plymouth: 48%
Typical yearly energy cost
£927
EPCs since 2021, at prices then
Built before 1930
36%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Plymouth average.

  • Band A, score 92 to 100: <1% of homes; Plymouth <1%.
  • Band B, score 81 to 91: 13% of homes; Plymouth 11%.
  • Band C, score 69 to 80: 35% of homes; Plymouth 40%.
  • Band D, score 55 to 68: 40% of homes; Plymouth 38%.
  • Band E, score 39 to 54: 10% of homes; Plymouth 9%.
  • Band F, score 21 to 38: 1% of homes; Plymouth 1%.
  • Band G, score 1 to 20: <1% of homes; Plymouth <1%.

Based on the latest energy performance certificate (EPC) for each of 11,987 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in PL2.

Main heating

Gas boiler90%
Electric storage heaters4%
Other electric heating3%
Communal or district heating1%
Other or unrecorded1%

Type of home

House68%
Flat28%
Bungalow3%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated36%
Cavity walls, not insulated14%
Cavity walls, insulated25%
Solid walls, insulated2%
Other walls (timber, system-built or modern)23%
Loft insulation under 100 mm (homes with a loft)27%
Double or triple glazing throughout92%
Solar panels3%

Upgrades recommended for homes in PL2

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solid wall insulation (internal or external) More common here

    On 39% of EPCs here (England and Wales: 24%). 36% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Solar panels (PV)

    On 62% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 54% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 53% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 17% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 16% of EPCs here (England and Wales: 16%). 14% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 93% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £165 a year, at the prices used when each EPC was issued.

Map of PL2 and nearby areas

How PL2 compares with the postcode districts around it.

PL6, Plymouth: C 69PL12, Saltash: D 64PL5, Plymouth: D 68PL3, Plymouth: D 65PL11, Torpoint: D 62PL1, Plymouth: C 70PL4, Plymouth: D 66PL10, Torpoint: E 51PL9, Plymouth: C 70PL3PL1PL4PL2PL3PL1PL4PL2
Colour shows each district's average rating. Tap a district to open it. PL2 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in PL2?

About 36% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. 36% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.