Skip to content
EPCMap

How energy efficient are homes in SA70 (Tenby, Pembrokeshire)?

Summary

Average rating

D63

Pembrokeshire average: D 62

Homes in SA70 have an average EPC rating of D (63), about the same as the Pembrokeshire average of D (62).

Rated D or worse
60%
Pembrokeshire: 61%
Typical yearly energy cost
£1,190
EPCs since 2021, at prices then
Built before 1930
30%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Pembrokeshire average.

  • Band A, score 92 to 100: 1% of homes; Pembrokeshire 3%.
  • Band B, score 81 to 91: 11% of homes; Pembrokeshire 10%.
  • Band C, score 69 to 80: 28% of homes; Pembrokeshire 27%.
  • Band D, score 55 to 68: 36% of homes; Pembrokeshire 34%.
  • Band E, score 39 to 54: 16% of homes; Pembrokeshire 18%.
  • Band F, score 21 to 38: 5% of homes; Pembrokeshire 7%.
  • Band G, score 1 to 20: 2% of homes; Pembrokeshire 3%.

Based on the latest energy performance certificate (EPC) for each of 3,895 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in SA70.

Main heating

Gas boiler59%
Oil boiler17%
Electric storage heaters9%
Other electric heating8%
Heat pump5%
Communal or district heating2%

Type of home

House51%
Flat28%
Bungalow19%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated28%
Cavity walls, not insulated16%
Cavity walls, insulated36%
Solid walls, insulated3%
Other walls (timber, system-built or modern)17%
Loft insulation under 100 mm (homes with a loft)17%
Double or triple glazing throughout82%
Solar panels2%

Upgrades recommended for homes in SA70

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Modern storage heaters More common here

    On 12% of EPCs here (England and Wales: 6%). 17% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Double glazing More common here

    On 15% of EPCs here (England and Wales: 9%). 18% of homes aren't fully double or triple glazed.

    Typical cost: £3,300–£6,500
  • Solar panels (PV)

    On 62% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 52% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 49% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 29% of EPCs here (England and Wales: 24%). 28% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000

With all its recommended upgrades, 89% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £203 a year, at the prices used when each EPC was issued.

Map of SA70 and nearby areas

How SA70 compares with the postcode districts around it.

SA62, Haverfordwest: D 58SA67, Narberth: D 59SA61, Haverfordwest: D 67SA33, Carmarthen: D 56SA34, Whitland: D 58SA68, Kilgetty: D 60SA73, Milford Haven: D 66SA72, Pembroke Dock: D 66SA71, Pembroke: D 63SA69, Saundersfoot: D 65SA68SA72SA71SA69SA70SA68SA72SA71SA69SA70
Colour shows each district's average rating. Tap a district to open it. SA70 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in SA70?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.