Skip to content
EPCMap

How energy efficient are homes in NR25 (Holt, North Norfolk)?

Summary

Average rating

D62

North Norfolk average: D 61

Homes in NR25 have an average EPC rating of D (62), about the same as the North Norfolk average of D (61).

Rated D or worse
60%
North Norfolk: 65%
Typical yearly energy cost
£1,388
EPCs since 2021, at prices then
Built before 1930
24%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the North Norfolk average.

  • Band A, score 92 to 100: 2% of homes; North Norfolk <1%.
  • Band B, score 81 to 91: 16% of homes; North Norfolk 9%.
  • Band C, score 69 to 80: 23% of homes; North Norfolk 25%.
  • Band D, score 55 to 68: 30% of homes; North Norfolk 38%.
  • Band E, score 39 to 54: 19% of homes; North Norfolk 19%.
  • Band F, score 21 to 38: 7% of homes; North Norfolk 6%.
  • Band G, score 1 to 20: 3% of homes; North Norfolk 2%.

Based on the latest energy performance certificate (EPC) for each of 4,730 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in NR25.

Main heating

Gas boiler42%
Oil boiler30%
Heat pump11%
Electric storage heaters9%
Other electric heating5%
Communal or district heating3%

Type of home

House64%
Bungalow29%
Flat6%

Walls, roof and windows

Solid walls, not insulated24%
Cavity walls, not insulated7%
Cavity walls, insulated44%
Solid walls, insulated4%
Other walls (timber, system-built or modern)21%
Loft insulation under 100 mm (homes with a loft)12%
Double or triple glazing throughout86%
Solar panels1%

Upgrades recommended for homes in NR25

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Modern storage heaters More common here

    On 10% of EPCs here (England and Wales: 6%). 13% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Solar panels (PV)

    On 86% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 79% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 56% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 25% of EPCs here (England and Wales: 24%). 24% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 22% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000

With all its recommended upgrades, 88% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £217 a year, at the prices used when each EPC was issued.

Map of NR25 and nearby areas

How NR25 compares with the postcode districts around it.

NR23, Wells-Next-The-Sea: D 63PE31, King'S Lynn: D 61NR26, Sheringham: D 64NR27, Cromer: D 63NR22, Walsingham: E 52NR24, Melton Constable: D 57NR28, North Walsham: D 65NR11, Norwich: D 62NR21, Fakenham: D 61NR10, Norwich: D 64NR12, Norwich: D 59PE32, King'S Lynn: D 58NR20, Dereham: D 63NR23NR26NR27NR22NR24NR11NR21NR25NR23NR26NR27NR22NR24NR11NR21NR25
Colour shows each district's average rating. Tap a district to open it. NR25 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in NR25?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.