Skip to content
EPCMap

How energy efficient are homes in SO41 (Lymington, New Forest)?

Summary

Average rating

D67

New Forest average: D 66

Homes in SO41 have an average EPC rating of D (67), about the same as the New Forest average of D (66).

Rated D or worse
51%
New Forest: 54%
Typical yearly energy cost
£1,066
EPCs since 2021, at prices then
Built before 1930
13%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the New Forest average.

  • Band A, score 92 to 100: <1% of homes; New Forest <1%.
  • Band B, score 81 to 91: 10% of homes; New Forest 8%.
  • Band C, score 69 to 80: 39% of homes; New Forest 37%.
  • Band D, score 55 to 68: 38% of homes; New Forest 40%.
  • Band E, score 39 to 54: 10% of homes; New Forest 12%.
  • Band F, score 21 to 38: 2% of homes; New Forest 2%.
  • Band G, score 1 to 20: <1% of homes; New Forest <1%.

Based on the latest energy performance certificate (EPC) for each of 12,052 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in SO41.

Main heating

Gas boiler84%
Electric storage heaters5%
Communal or district heating3%
Oil boiler3%
Other electric heating3%
Heat pump2%

Type of home

House62%
Flat18%
Bungalow17%
Maisonette3%

Walls, roof and windows

Solid walls, not insulated5%
Cavity walls, not insulated24%
Cavity walls, insulated55%
Other walls (timber, system-built or modern)15%
Loft insulation under 100 mm (homes with a loft)16%
Double or triple glazing throughout89%
Solar panels1%

Upgrades recommended for homes in SO41

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Cavity wall insulation More common here

    On 25% of EPCs here (England and Wales: 16%). 24% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Solar panels (PV)

    On 72% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 59% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 56% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 22% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 15% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 92% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £140 a year, at the prices used when each EPC was issued.

Map of SO41 and nearby areas

How SO41 compares with the postcode districts around it.

SO40, Southampton: D 66SO31, Southampton: C 70SO19, Southampton: D 67SO45, Southampton: D 66SO43, Lyndhurst: D 61SO42, Brockenhurst: D 60BH24, Ringwood: D 66PO32, East Cowes: C 69BH25, New Milton: D 66BH7, Bournemouth: D 64PO31, Cowes: D 65BH23, Christchurch: D 67PO41, Yarmouth: D 60BH6, Bournemouth: D 66PO30, Newport: D 66PO40, Freshwater: D 65PO39, Totland Bay: D 65PO38, Ventnor: D 60SO45SO42BH24BH25PO31BH23PO41PO30PO39SO41SO45SO42BH24BH25PO31BH23PO41BH6PO30PO40PO39SO41
Colour shows each district's average rating. Tap a district to open it. SO41 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in SO41?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.