Skip to content
EPCMap

How energy efficient are homes in MK9 (Milton Keynes)?

Summary

Average rating

C79

Milton Keynes average: C 72

Homes in MK9 have an average EPC rating of C (79), well above the Milton Keynes average of C (72). 94% of homes here are flats or maisonettes.

Rated D or worse
10%
Milton Keynes: 33%
Typical yearly energy cost
£529
EPCs since 2021, at prices then

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Milton Keynes average.

  • Band A, score 92 to 100: 3% of homes; Milton Keynes 2%.
  • Band B, score 81 to 91: 49% of homes; Milton Keynes 24%.
  • Band C, score 69 to 80: 38% of homes; Milton Keynes 41%.
  • Band D, score 55 to 68: 8% of homes; Milton Keynes 27%.
  • Band E, score 39 to 54: 2% of homes; Milton Keynes 5%.
  • Band F, score 21 to 38: 0% of homes; Milton Keynes <1%.
  • Band G, score 1 to 20: 0% of homes; Milton Keynes <1%.

Based on the latest energy performance certificate (EPC) for each of 4,881 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in MK9.

Main heating

Other electric heating39%
Communal or district heating36%
Gas boiler17%
Electric storage heaters6%
Oil boiler2%

Type of home

Flat93%
House5%
Maisonette2%

Walls, roof and windows

Cavity walls, not insulated8%
Cavity walls, insulated14%
Other walls (timber, system-built or modern)78%
Loft insulation under 100 mm (homes with a loft)18%
Double or triple glazing throughout96%

Upgrades recommended for homes in MK9

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Hot water cylinder insulation

    On 7% of EPCs here (England and Wales: 8%).

    Typical cost: £15–£30
  • Modern storage heaters

    On 6% of EPCs here (England and Wales: 6%). 44% of homes here are heated by electricity.

    Typical cost: £1,200–£1,800
  • Cavity wall insulation

    On 5% of EPCs here (England and Wales: 16%). 8% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Solar panels (PV)

    On 5% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Floor insulation

    On 5% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar water heating

    On 4% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000

With all its recommended upgrades, 96% of homes here could reach a C rating or better.

On EPCs issued since 2021, most homes here show little or no saving from their recommended upgrades, often because they're already efficient.

Map of MK9 and nearby areas

How MK9 compares with the postcode districts around it.

MK20, Ouzelmere: B 86MK16, Newport Pagnell: D 65MK12, Milton Keynes: C 69MK14, Milton Keynes: C 72MK10, Milton Keynes: C 79MK13, Milton Keynes: D 67MK11, Milton Keynes: C 72MK15, Milton Keynes: C 70MK8, Milton Keynes: C 77MK5, Milton Keynes: C 72MK6, Milton Keynes: C 69MK19, Milton Keynes: D 68MK1, Milton Keynes: D 66MK7, Milton Keynes: C 70MK4, Milton Keynes: C 74MK3, Milton Keynes: C 72MK17, Milton Keynes: C 72MK18, Buckingham: C 69MK14MK13MK15MK8MK5MK6MK9MK14MK13MK15MK8MK5MK6MK9
Colour shows each district's average rating. Tap a district to open it. MK9 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in MK9?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.