Skip to content
EPCMap

How energy efficient are homes in IG9 (Buckhurst Hill, Epping Forest)?

Summary

Average rating

D65

Epping Forest average: D 66

Homes in IG9 have an average EPC rating of D (65), about the same as the Epping Forest average of D (66). 42% of homes here have solid walls with no insulation.

Rated D or worse
59%
Epping Forest: 54%
Typical yearly energy cost
£1,055
EPCs since 2021, at prices then
Built before 1930
18%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Epping Forest average.

  • Band A, score 92 to 100: <1% of homes; Epping Forest <1%.
  • Band B, score 81 to 91: 6% of homes; Epping Forest 11%.
  • Band C, score 69 to 80: 35% of homes; Epping Forest 35%.
  • Band D, score 55 to 68: 42% of homes; Epping Forest 38%.
  • Band E, score 39 to 54: 14% of homes; Epping Forest 13%.
  • Band F, score 21 to 38: 2% of homes; Epping Forest 2%.
  • Band G, score 1 to 20: <1% of homes; Epping Forest <1%.

Based on the latest energy performance certificate (EPC) for each of 3,997 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in IG9.

Main heating

Gas boiler84%
Other electric heating7%
Electric storage heaters6%
Communal or district heating1%

Type of home

House54%
Flat41%
Bungalow3%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated42%
Cavity walls, not insulated19%
Cavity walls, insulated28%
Solid walls, insulated2%
Other walls (timber, system-built or modern)10%
Loft insulation under 100 mm (homes with a loft)34%
Double or triple glazing throughout85%

Upgrades recommended for homes in IG9

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solid wall insulation (internal or external) More common here

    On 43% of EPCs here (England and Wales: 24%). 42% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • Solar panels (PV)

    On 56% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Floor insulation

    On 48% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solar water heating

    On 43% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 24% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 20% of EPCs here (England and Wales: 16%). 19% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 91% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £216 a year, at the prices used when each EPC was issued.

Map of IG9 and nearby areas

How IG9 compares with the postcode districts around it.

IG8, Woodford Green: D 64EN3, Enfield: D 67IG10, Loughton: D 66RM4, Romford: D 62IG7, Chigwell: D 67E4, London: D 66IG6, Ilford: D 67IG5, Ilford: D 64E18, London: D 66E17, London: C 69IG8IG7E4IG9IG8IG7E4IG9
Colour shows each district's average rating. Tap a district to open it. IG9 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in IG9?

About 42% of homes here have solid walls with no insulation, which lose much more heat than insulated walls. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.