Skip to content
EPCMap

How energy efficient are homes in SG10 (Much Hadham, East Hertfordshire)?

Summary

Average rating

D61

East Hertfordshire average: D 68

Homes in SG10 have an average EPC rating of D (61), well below the East Hertfordshire average of D (68).

Rated D or worse
65%
East Hertfordshire: 46%
Typical yearly energy cost
£1,611
EPCs since 2021, at prices then
Built before 1930
32%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the East Hertfordshire average.

  • Band A, score 92 to 100: 0% of homes; East Hertfordshire 1%.
  • Band B, score 81 to 91: 8% of homes; East Hertfordshire 21%.
  • Band C, score 69 to 80: 28% of homes; East Hertfordshire 32%.
  • Band D, score 55 to 68: 38% of homes; East Hertfordshire 32%.
  • Band E, score 39 to 54: 17% of homes; East Hertfordshire 11%.
  • Band F, score 21 to 38: 7% of homes; East Hertfordshire 2%.
  • Band G, score 1 to 20: 2% of homes; East Hertfordshire <1%.

Based on the latest energy performance certificate (EPC) for each of 557 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in SG10.

Main heating

Gas boiler73%
Oil boiler21%
Heat pump3%
Communal or district heating1%
Other electric heating1%

Type of home

House79%
Bungalow13%
Flat8%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated30%
Cavity walls, not insulated15%
Cavity walls, insulated31%
Solid walls, insulated3%
Other walls (timber, system-built or modern)20%
Loft insulation under 100 mm (homes with a loft)28%
Double or triple glazing throughout74%
Solar panels1%

Upgrades recommended for homes in SG10

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Draught proofing More common here

    On 11% of EPCs here (England and Wales: 4%).

    Typical cost: £80–£120
  • Double glazing More common here

    On 21% of EPCs here (England and Wales: 9%). 26% of homes aren't fully double or triple glazed.

    Typical cost: £3,300–£6,500
  • Solar panels (PV)

    On 86% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 59% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 58% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 33% of EPCs here (England and Wales: 24%). 30% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000

With all its recommended upgrades, 88% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £325 a year, at the prices used when each EPC was issued.

Map of SG10 and nearby areas

How SG10 compares with the postcode districts around it.

CM22, Bishop'S Stortford: C 70SG9, Buntingford: D 68CM24, Stansted: C 71SG11, Ware: D 64CM23, Bishop'S Stortford: C 71CM21, Sawbridgeworth: D 68SG12, Ware: D 66CM20, Harlow: C 70CM17, Harlow: C 72SG13, Hertford: D 68CM5, Ongar: D 64SG11CM23CM21SG12CM20SG10SG11CM23CM21SG12CM20SG10
Colour shows each district's average rating. Tap a district to open it. SG10 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in SG10?

32% were built before 1930. Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.