Skip to content
EPCMap

How energy efficient are homes in EX11 (Ottery St. Mary, East Devon)?

Summary

Average rating

D67

East Devon average: D 66

Homes in EX11 have an average EPC rating of D (67), about the same as the East Devon average of D (66).

Rated D or worse
50%
East Devon: 51%
Typical yearly energy cost
£1,316
EPCs since 2021, at prices then
Built before 1930
19%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the East Devon average.

  • Band A, score 92 to 100: <1% of homes; East Devon 1%.
  • Band B, score 81 to 91: 18% of homes; East Devon 19%.
  • Band C, score 69 to 80: 31% of homes; East Devon 29%.
  • Band D, score 55 to 68: 36% of homes; East Devon 33%.
  • Band E, score 39 to 54: 11% of homes; East Devon 13%.
  • Band F, score 21 to 38: 2% of homes; East Devon 4%.
  • Band G, score 1 to 20: <1% of homes; East Devon 1%.

Based on the latest energy performance certificate (EPC) for each of 3,162 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in EX11.

Main heating

Gas boiler75%
Oil boiler12%
Electric storage heaters6%
Heat pump3%
Other electric heating2%
Communal or district heating1%

Type of home

House71%
Bungalow20%
Flat9%
Maisonette1%

Walls, roof and windows

Solid walls, not insulated15%
Cavity walls, not insulated16%
Cavity walls, insulated45%
Solid walls, insulated1%
Other walls (timber, system-built or modern)23%
Loft insulation under 100 mm (homes with a loft)11%
Double or triple glazing throughout89%
Solar panels2%

Upgrades recommended for homes in EX11

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 82% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 68% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 54% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 21% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 19% of EPCs here (England and Wales: 16%). 16% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500
  • Solid wall insulation (internal or external)

    On 14% of EPCs here (England and Wales: 24%). 15% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000

With all its recommended upgrades, 93% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £224 a year, at the prices used when each EPC was issued.

Map of EX11 and nearby areas

How EX11 compares with the postcode districts around it.

TA20, Chard: D 66EX15, Cullompton: D 67EX14, Honiton: D 63EX6, Exeter: D 60EX3, Exeter: C 69EX1, Exeter: C 74EX13, Axminster: D 63EX12, Seaton: D 64EX4, Exeter: D 68EX24, Colyton: D 61EX2, Exeter: C 72EX10, Sidmouth: D 64EX5, Exeter: C 69EX9, Budleigh Salterton: D 64EX8, Exmouth: D 67EX3EX10EX5EX11EX3EX1EX12EX24EX10EX5EX11
Colour shows each district's average rating. Tap a district to open it. EX11 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in EX11?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.