Skip to content
EPCMap

How energy efficient are homes in B47 (Birmingham, Bromsgrove)?

Summary

Average rating

D65

Bromsgrove average: D 66

Homes in B47 have an average EPC rating of D (65), about the same as the Bromsgrove average of D (66).

Rated D or worse
60%
Bromsgrove: 55%
Typical yearly energy cost
£1,392
EPCs since 2021, at prices then
Built before 1930
4%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Bromsgrove average.

  • Band A, score 92 to 100: <1% of homes; Bromsgrove 1%.
  • Band B, score 81 to 91: 10% of homes; Bromsgrove 13%.
  • Band C, score 69 to 80: 30% of homes; Bromsgrove 31%.
  • Band D, score 55 to 68: 44% of homes; Bromsgrove 39%.
  • Band E, score 39 to 54: 13% of homes; Bromsgrove 13%.
  • Band F, score 21 to 38: 4% of homes; Bromsgrove 3%.
  • Band G, score 1 to 20: <1% of homes; Bromsgrove <1%.

Based on the latest energy performance certificate (EPC) for each of 2,843 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in B47.

Main heating

Gas boiler89%
Other electric heating4%
Communal or district heating2%
Electric storage heaters2%
Oil boiler2%

Type of home

House72%
Bungalow15%
Flat12%
Park home1%

Walls, roof and windows

Solid walls, not insulated14%
Cavity walls, not insulated20%
Cavity walls, insulated52%
Solid walls, insulated1%
Other walls (timber, system-built or modern)13%
Loft insulation under 100 mm (homes with a loft)33%
Double or triple glazing throughout93%
Solar panels1%

Upgrades recommended for homes in B47

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Loft insulation top-up More common here

    On 18% of EPCs here (England and Wales: 12%). 33% of homes with a loft have less than 100 mm of insulation.

    Typical cost: £100–£350
  • Solar panels (PV)

    On 84% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 67% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 62% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • New condensing boiler

    On 24% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Cavity wall insulation

    On 22% of EPCs here (England and Wales: 16%). 20% of homes here have unfilled cavity walls.

    Typical cost: £500–£1,500

With all its recommended upgrades, 92% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £211 a year, at the prices used when each EPC was issued.

Map of B47 and nearby areas

How B47 compares with the postcode districts around it.

B30, Birmingham: D 64B31, Birmingham: D 67B29, Birmingham: D 66B13, Birmingham: D 63B90, Solihull: C 69B28, Birmingham: D 62B32, Birmingham: D 66B38, Birmingham: D 67B14, Birmingham: D 62B91, Solihull: D 66B92, Solihull: D 63B45, Birmingham: D 68B60, Bromsgrove: D 67B93, Solihull: D 66B48, Birmingham: D 64B94, Solihull: D 60B98, Redditch: D 68B97, Redditch: C 69B30B31B90B38B14B48B94B47B30B31B90B38B14B48B94B47
Colour shows each district's average rating. Tap a district to open it. B47 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in B47?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.