Summary

Average rating

D68

Bristol, City of average: D 67

Homes in BS11 have an average EPC rating of D (68), about the same as the Bristol, City of average of D (67).

Rated D or worse
46%
Bristol, City of: 50%
Typical yearly energy cost
£814
EPCs since 2021, at prices then
Built before 1930
16%

How ratings are spread

Share of homes in each band, with the score range for each. The dark line marks the Bristol, City of average.

  • Band A, score 92 to 100: <1% of homes; Bristol, City of <1%.
  • Band B, score 81 to 91: 10% of homes; Bristol, City of 11%.
  • Band C, score 69 to 80: 43% of homes; Bristol, City of 38%.
  • Band D, score 55 to 68: 34% of homes; Bristol, City of 37%.
  • Band E, score 39 to 54: 10% of homes; Bristol, City of 11%.
  • Band F, score 21 to 38: 2% of homes; Bristol, City of 2%.
  • Band G, score 1 to 20: <1% of homes; Bristol, City of <1%.

Based on the latest energy performance certificate (EPC) for each of 5,970 homes, up to October 2026. EPCs rate homes from A (most efficient) to G (least), with a score out of 100.

What homes here are like

What EPC assessors recorded when they visited homes in BS11.

Main heating

Gas boiler81%
Electric storage heaters6%
Communal or district heating5%
Heat pump4%
Other electric heating3%

Type of home

House63%
Flat33%
Bungalow3%
Maisonette2%

Walls, roof and windows

Solid walls, not insulated18%
Cavity walls, not insulated11%
Cavity walls, insulated39%
Solid walls, insulated3%
Other walls (timber, system-built or modern)29%
Loft insulation under 100 mm (homes with a loft)19%
Double or triple glazing throughout92%
Solar panels2%

Upgrades recommended for homes in BS11

Upgrades that are unusually common here come first, then the ones that appear most often on local EPCs. Costs are the EPC's guide prices, not quotes.

  • Solar panels (PV)

    On 59% of EPCs here (England and Wales: 66%).

    Typical cost: £5,000–£8,000
  • Solar water heating

    On 55% of EPCs here (England and Wales: 56%).

    Typical cost: £4,000–£6,000
  • Floor insulation

    On 50% of EPCs here (England and Wales: 49%).

    Typical cost: £4,000–£6,000
  • Solid wall insulation (internal or external)

    On 24% of EPCs here (England and Wales: 24%). 18% of homes here have solid walls with no insulation.

    Typical cost: £4,000–£14,000
  • New condensing boiler

    On 21% of EPCs here (England and Wales: 20%).

    Typical cost: £2,200–£3,000
  • Heating controls

    On 18% of EPCs here (England and Wales: 16%).

    Typical cost: £350–£450

With all its recommended upgrades, 93% of homes here could reach a C rating or better.

On EPCs issued since 2021, making every recommended upgrade would cut the typical home's energy cost by about £102 a year, at the prices used when each EPC was issued.

Map of BS11 and nearby areas

How BS11 compares with the postcode districts around it.

NP26, Caldicot: C 71BS34, Bristol: C 72BS35, Bristol: D 68BS16, Bristol: C 69BS32, Bristol: D 68BS10, Bristol: C 71BS20, Bristol: C 70BS5, Bristol: D 67BS7, Bristol: D 67BS9, Bristol: D 62BS1, Bristol: C 74BS6, Bristol: D 63BS4, Bristol: D 66BS2, Bristol: C 72BS8, Bristol: D 64BS41, Bristol: D 67BS21, Clevedon: D 65BS48, Bristol: D 67BS34BS32BS10BS20BS7BS9BS1BS6BS8BS11BS34BS32BS10BS20BS5BS7BS9BS1BS6BS2BS8BS11
Colour shows each district's average rating. Tap a district to open it. BS11 Not enough EPCs

Neighbouring districts

Common questions

What holds energy ratings back in BS11?

Older homes, uninsulated walls and lofts, and electric or oil heating all pull ratings down.

Can I see the rating for my own home?

Yes. Individual certificates are on the official EPC Register on GOV.UK. EPCMap only shows figures for whole areas.

Are there grants for upgrades?

Some upgrades may qualify for government schemes, such as the Boiler Upgrade Scheme for heat pumps. Check current eligibility on GOV.UK.

How up to date is this?

We use the latest certificate for each home and refresh the data monthly. A certificate describes a home on the day it was assessed, so later improvements won't show until a new EPC is done.